Kampala, Uganda · Est. 2009

Building
Uganda's
Foundation

A trusted local civil construction company delivering roads, bridges, drainage systems, and infrastructure across Uganda since 2009.

15+ Years Active
10+ Major Projects
8+ Associates
Est. 2009
Road Works Box Culverts Bridge Construction Drainage Systems Transmission Line Foundations Office Buildings Precast Installation Stone Pitching Road Works Box Culverts Bridge Construction Drainage Systems Transmission Line Foundations Office Buildings Precast Installation Stone Pitching

Local Expertise,
National Impact

Selective Services Limited is a Ugandan civil construction company headquartered in Kampala. Since our establishment in 2009, we have built a strong reputation as a reliable subcontractor and primary contractor on critical infrastructure projects across Uganda.

We work alongside leading international and local firms — including China Wu Yi, KEC International, and Polat Yol — bringing on-ground expertise, local knowledge, and disciplined project execution to every engagement.

Our vision is to become the most reputable local contractor for all types of civil works in Uganda — committed to building long-term relationships with our stakeholders while upholding safety and environmental standards.

🏛 Integrity

The courage to maintain the right from the wrong without compromise, in every decision we make.

🎯 Reliability

The ability to deliver on what we promise, without exception — on time, on budget, to specification.

⚖️ Accountability

The strength to be responsible for our own actions and decisions at every level of the organisation.

🤝 Mission

Creating strong partnerships between employees, managers, and stakeholders focused on executing projects efficiently and productively.

Our Services

From civil foundations to complete building construction, we bring proven capability across multiple civil engineering disciplines.

🌉

Bridges & Box Culverts

Single cell to multiple cell box culvert construction, including formwork, reinforcement, and concrete works to UNRA standards.

🚧

Drainage Systems

Cross culverts, access culverts, concrete drains, stone pitching drainage, and slope protection for road infrastructure projects.

🔩

Precast Installation

Road kerbs, chutes, pedestrian slabs, KM posts, UNRA posts, and duct marker posts — full precast supply and installation.

Civil & Foundation Works

Specialist foundation works for UETCL transmission line towers, including Class 1, 2 & 3 foundation construction across multiple locations.

🏢

Building Construction

Residential and office building construction including office blocks, light gauge steel frame buildings, boundary walls, and paver block installations.

🔧

Service Ducts & Manholes

Construction of service ducts, manholes with cover slabs, and complete underground utility infrastructure for road projects.

Selected Projects

Over 15 years, Selective Services Limited has delivered critical infrastructure projects for Uganda's national road authority, electricity transmission company, and private sector clients — working alongside international contractors and local firms alike.

01
Main Contractor: China Wu Yi Co Ltd · Client: UNRA

Buhimba–Kakumiro Road Works

Comprehensive road works including single and double cell box culverts, access culverts at 522 locations, service ducts at 45 locations, precast installation (chutes 450m, kerbstone 5,325m, pedestrian slabs 399 nos), and stone pitching works of 37,500 M².

Road Infrastructure
02
Main Contractor: Polat Yol · Client: UNRA

Muyembe–Nakarapirit Road Upgrade

Single to multiple cell box culverts. Formwork 7,477 M², Reinforcement 350 Tons, Concrete 3,258 M³. Consultant: SCET Tunisie in JV with MBW Consulting Ltd.

Road Upgrade
03
Main Contractor: KEC International · Client: UETCL

132kV Kole–Gulu–Nebbi–Arua Transmission Line

Foundation works at 54 tower locations for the DC transmission line. Consultant: Power Grid Corporation of India Ltd.

Energy Infrastructure
04
Main Contractor: SBC (Uganda) Ltd · Client: UNRA

Kabaale Airport Infrastructure

Concrete drain 3,098 LM, stone pitching drain 1,936 M², kerbstone 3,620 LM, and paver blocks 5,001 M².

Airport Works
05
Main Contractor: KEC International · Client: UETCL

Gulu–Agago 132kV Double Circuit Line – Lot B

Foundation works for Class 1, 2 & 3 tower types across 12 locations. Consultant: Shaker Consultancy Uganda Ltd.

Energy Infrastructure
06
Main Contractor: China Wu Yi · Client: UNRA

Nansana–Busunju Box Culvert & Solar Works

Triple cell box culverts — rock filling 1,136 M³, formwork 1,546 M², reinforcement 88 Tons, concrete 621 M³, waterproofing 982 M². Solar light foundations: 249 locations across Nansana, Wakiso, Kakiri & Busunju.

Road & Civil Works
07
Client: Impact Building Solutions Foundation Ltd

Lubaga Emergency Services Training School

Construction of light gauge steel frame (LGSF) building for offices at Lubaga Hospital, Kampala.

Building Works
08
Client: G-Unit Security Ltd

G-Unit Office Block, Kisasi

Construction of office block — office area 234 M², boundary wall 126 LM, paver blocks 900 M².

Commercial Building

Plant &
Equipment

Selective Services Limited maintains a fully-owned fleet of construction plant and transport vehicles — all in active working condition — enabling us to mobilise rapidly and execute projects without dependence on hired machinery.

🏗️

JCB Backhoe

3CX · Owned & Working
🚛

Concrete Transit Mixer

Dieci L4700 · 3.5 M³
⚙️

Concrete Mixers

6 Units · 250–450 Ltrs
🔄

Pedestrian Rollers

4 Units · 0.65–0.85 Ton
💧

Water Pumps

4 Units · 2"–4" Inch
🚚

Tippers & Trucks

5 Units · 5–7 Ton Capacity
🚗

Site Vehicles

5 Units · Pickups & Wagons

Generators & Welders

Diesel & Petrol · Multiple Sets
Commitments

Health, Safety
& Environment

🦺

Health & Safety

We safeguard the health and safety of all employees and project members. Our staff undergoes extensive technical and HSE training to ensure every job is done safely, meeting and exceeding all relevant legislative requirements.

🌿

Environmental Protection

Care for the environment is one of our key responsibilities and plays a central role in how we conduct all business activities. We are committed to minimising our environmental footprint on every project site.

Our Environmental Commitments

  • Protect the environment by striving to minimise pollution of land, air, and water across all project sites.
  • Keep material wastage to a minimum and maximise the efficient use of resources on every project.
  • Manage and dispose of all site waste in a responsible and compliant manner.
  • Ensure all team members are trained in environmental best practices before site mobilisation.
  • Comply fully with all applicable Ugandan environmental legislation and authoritative guidance.

Associate Companies

CW

China Wu Yi Co Ltd

PY

Polat Yol Yapi Sanayi ve Ticaret A.S

SB

SBI (SBC) Uganda

KE

KEC International Ltd

IB

Impact Building Solutions Foundation Ltd

GU

G-Unit Security Ltd

GS

Ghanshyam Services Ltd

AB

Afro Build (U) Ltd

Get In
Touch

📍

Address

Plot 33, Sir Apollo Kaggwa Road
Old Kampala, Kampala
P.O. Box 11091, Uganda

📞
✉️
🕐

Office Hours

Monday – Friday: 8:00 AM – 5:00 PM
Saturday: 9:00 AM – 1:00 PM

Send an Enquiry