Iganga Campsite
SGR Project

Construction and full finishing of a multi-building workforce campsite in Iganga, Eastern Uganda — delivered as subcontractor to Yapi Merkezi on the Malaba–Kampala Standard Gauge Railway.

Currently Active · Ongoing Works
Client (End)
Uganda SGR Authority
Main Contractor
Yapi Merkezi
SSL Role
Subcontractor
Location
Iganga, Eastern Uganda
Project Type
Building Construction & Finishing

The Iganga Campsite is one of Selective Services Limited's most significant ongoing engagements. As subcontractor to Yapi Merkezi — the main contractor on the Malaba–Kampala Standard Gauge Railway (SGR) — SSL is responsible for the full construction and finishing of a purpose-built workforce campsite in Iganga, Eastern Uganda.

The campsite serves as the operational base for the SGR project workforce in this corridor, providing accommodation and support facilities across seven distinct buildings. SSL's scope spans both structural civil works and complete interior finishing works, making this one of the most comprehensive building projects in the company's portfolio.

Project Overview

The Iganga Campsite comprises 11 building structures — three two-storey dormitory blocks for Foremen, Engineers, and Workers, plus an Office Building, Dining Hall, Infirmary, Laundry, two QC Laboratories, and two Warehouses. Nine of the eleven structures are Light Gauge Steel Frame (LGSF) buildings; the two warehouses are conventional steel-framed structures with interlocking paver block flooring.

SSL manages the full project lifecycle on site, including civil works, masonry, plastering, gypsum drylining, painting, tiling, and all associated MEP finishing coordination with Yapi Merkezi's technical teams. The project also operates under a strict Health, Safety and Environmental (HSE) framework in accordance with Yapi Merkezi's site requirements.

Buildings on Site

# Building Structure Type Floors Primary Use
01Foremen Dormitory (FD)LGSF2Accommodation — Foremen
02Engineers Dormitory (ED)LGSF2Accommodation — Engineers
03Workers Dormitory (WD)LGSF2Accommodation — Workers
04Office BuildingLGSF1Project Administration
05Dining HallLGSF1Canteen & Food Service
06InfirmaryLGSF1Medical & First Aid
07LaundryLGSF1Laundry Facility
08Large WarehouseSteel Structure · Interlocking Paver Floor1Materials Storage
09Small WarehouseSteel Structure · Interlocking Paver Floor1Materials Storage
10Lab at Batching PlantLGSF1Quality Control Laboratory
11Lab near Small WarehouseLGSF1Quality Control Laboratory

Scope of Works

HSE & Site Management

The Iganga Campsite operates under SSL's Health, Safety and Environmental management framework, aligned with the requirements of Yapi Merkezi's project HSE plan and Uganda's Occupational Safety and Health Act 2006. SSL maintains a dedicated HSE and site management presence on the campsite at all times.

Vendor access control, toolbox talks, PPE compliance, and daily site inspections are conducted as part of the regular site management routine. SSL coordinates directly with Yapi Merkezi's Environmental and Social team on matters including community liaison, worker welfare, and environmental compliance.

Photo Gallery

Iganga Campsite — Dormitory blocks Iganga Campsite — Dormitory facade Iganga Campsite — Steel warehouse interior with paver flooring

Above: Completed two-storey LGSF dormitory blocks and the interior of a steel warehouse with interlocking paver block flooring — Iganga Campsite, 2025.

11
Building Structures on Site
2
Storeys — Dormitory Blocks
SGR
Standard Gauge Railway — Malaba–Kampala
Active
Project Status — Currently Ongoing

Enquire About This Project

Looking for a similar campsite or building construction capability? Get in touch with our team.

Contact SSL →
← G-Unit Office Block All Projects Buhimba–Kakumiro →