Construction and full finishing of a multi-building workforce campsite in Iganga, Eastern Uganda — delivered as subcontractor to Yapi Merkezi on the Malaba–Kampala Standard Gauge Railway.
The Iganga Campsite is one of Selective Services Limited's most significant ongoing engagements. As subcontractor to Yapi Merkezi — the main contractor on the Malaba–Kampala Standard Gauge Railway (SGR) — SSL is responsible for the full construction and finishing of a purpose-built workforce campsite in Iganga, Eastern Uganda.
The campsite serves as the operational base for the SGR project workforce in this corridor, providing accommodation and support facilities across seven distinct buildings. SSL's scope spans both structural civil works and complete interior finishing works, making this one of the most comprehensive building projects in the company's portfolio.
The Iganga Campsite comprises 11 building structures — three two-storey dormitory blocks for Foremen, Engineers, and Workers, plus an Office Building, Dining Hall, Infirmary, Laundry, two QC Laboratories, and two Warehouses. Nine of the eleven structures are Light Gauge Steel Frame (LGSF) buildings; the two warehouses are conventional steel-framed structures with interlocking paver block flooring.
SSL manages the full project lifecycle on site, including civil works, masonry, plastering, gypsum drylining, painting, tiling, and all associated MEP finishing coordination with Yapi Merkezi's technical teams. The project also operates under a strict Health, Safety and Environmental (HSE) framework in accordance with Yapi Merkezi's site requirements.
| # | Building | Structure Type | Floors | Primary Use |
|---|---|---|---|---|
| 01 | Foremen Dormitory (FD) | LGSF | 2 | Accommodation — Foremen |
| 02 | Engineers Dormitory (ED) | LGSF | 2 | Accommodation — Engineers |
| 03 | Workers Dormitory (WD) | LGSF | 2 | Accommodation — Workers |
| 04 | Office Building | LGSF | 1 | Project Administration |
| 05 | Dining Hall | LGSF | 1 | Canteen & Food Service |
| 06 | Infirmary | LGSF | 1 | Medical & First Aid |
| 07 | Laundry | LGSF | 1 | Laundry Facility |
| 08 | Large Warehouse | Steel Structure · Interlocking Paver Floor | 1 | Materials Storage |
| 09 | Small Warehouse | Steel Structure · Interlocking Paver Floor | 1 | Materials Storage |
| 10 | Lab at Batching Plant | LGSF | 1 | Quality Control Laboratory |
| 11 | Lab near Small Warehouse | LGSF | 1 | Quality Control Laboratory |
The Iganga Campsite operates under SSL's Health, Safety and Environmental management framework, aligned with the requirements of Yapi Merkezi's project HSE plan and Uganda's Occupational Safety and Health Act 2006. SSL maintains a dedicated HSE and site management presence on the campsite at all times.
Vendor access control, toolbox talks, PPE compliance, and daily site inspections are conducted as part of the regular site management routine. SSL coordinates directly with Yapi Merkezi's Environmental and Social team on matters including community liaison, worker welfare, and environmental compliance.
Above: Completed two-storey LGSF dormitory blocks and the interior of a steel warehouse with interlocking paver block flooring — Iganga Campsite, 2025.