Over 15 years delivering critical civil infrastructure across Uganda — roads, bridges, energy foundations, airports, buildings, and railway infrastructure.
Main Contractor: China Wu Yi Co Ltd
Comprehensive road works including single and double cell box culverts, access culverts at 522 locations, service ducts at 45 locations, precast installation, and stone pitching works of 37,500M².
Main Contractor: Polat Yol · Consultant: SCET Tunisie / MBW
Single to multiple cell box culverts — 7,477M² formwork, 350 tons reinforcement, 3,258M³ concrete.
Main Contractor: KEC International Ltd · Consultant: PGCIL India
Foundation works at 54 tower locations for the DC transmission line across northern Uganda.
Main Contractor: SBC (Uganda) Ltd
Concrete drain, stone pitching, kerbstone, and paver block installation at Kabaale International Airport.
Main Contractor: KEC International Ltd · Consultant: Shaker Consultancy Uganda
Foundation works for Class 1, 2 & 3 tower types across 12 locations on the double circuit transmission line.
Main Contractor: China Wu Yi Co Ltd
Triple cell box culverts and 249 solar street light foundations across Nansana, Wakiso, Kakiri & Busunju.
Client: Impact Building Solutions Foundation Ltd
Light gauge steel frame (LGSF) office building constructed at Lubaga Hospital, Kampala.
Full Project Details →Client: G-Unit Security Ltd
Office block construction including 234M² office area, 126LM boundary wall, and 900M² paver blocks.
Main Contractor: Yapi Merkezi · Project: Malaba–Kampala SGR
Construction and full finishing of a multi-building workforce campsite in Iganga, Eastern Uganda. Eleven building structures including three two-storey LGSF dormitory blocks, office, dining hall, infirmary, laundry, two QC laboratories, and two steel warehouses.