Energy Infrastructure · Project 03

132kV Kole–Gulu–Nebbi–Arua Transmission Line

UETCL — delivered as subcontractor to KEC International Ltd.

Client
UETCL
Main Contractor
KEC International Ltd
Consultant
Power Grid Corporation of India Ltd
Location
Kole – Gulu – Nebbi – Arua
Sector
Energy Infrastructure
Reference
Project 03 of 08

SSL provided specialist civil and foundation works for KEC International on the 132kV DC transmission line stretching from Kole through Gulu, Nebbi, to Arua in northern Uganda. This project required precision foundation construction at 54 individual tower locations across a demanding terrain and long corridor.

Scope of Work

Photo Gallery

📷Transmission Line Corridor
Photos Coming Soon
📷Tower Foundation Excavation
📷Foundation Concrete Works
📷Completed Foundation
📷Tower Erection (Contractor)
54
Tower Foundations
132kV
DC Transmission Line
4
Districts Covered
Need a similar project?
Get In Touch →
← Muyembe–Nakarapirit (Prev) All Projects Kabaale Airport (Next) →